S513 - Balongan Pipeline

ClientPT Timas Suplindo (Ultimate Client: PT Pertamina E&P
LocationIndonesia
StartMay 2013
FinishOct 2013
Contract TypeTransportation & Installation
Value
Related Items
 -
Leighton Offshore has been awarded a Pipeline Transportation and Installation contract in Indonesia. The project is located in the Jawa region, Indonesia.

The engineering and planning works have commenced with the offshore installation campaign to commence in May 2013.

The project scope of work includes:

  • Installation Engineering, Transportation and Installation (T&I) of 12” Pipeline in water depth of 35m from landfall to existing platform including burial of pipes
  • Riser + subsea spool installation at existing platform.
  • Shore pull of 12” diameter pipelines to land fall point
  • Hydrotest and pre-commission from riser to land fall point

Leighton will use both the Faulkner and Stealth pipelay barges for this work. Being able to deploy our own purpose built fleet to projects such as this demonstrates the flexibility Leighton has in developing and deploying constructability focused engineering and installation solution for our clients.